Technologies: Electrical

National Security Administration (NSA) Renovate Serverland Room 2 at Fort George G. Meade

Meltech completed this important project for the National Security Administration for the renovation of the Serverland Room 2 at Fort George G. Meade in Fort Meade, Maryland. This project was for the National Security Administration Upgrade Infrastructure in Serverland Room 2. The work includes the following and all incidental related work: Convert Machine Room to Lab Room including demolition of select existing systems, retention and reuse of other existing systems, and installation of new architectural, mechanical, and electrical and fire protection systems/equipment. The work was conducted in a single phase. Work in this phase was required to be substantially complete and ready for occupancy within 210 calendar days after No-tice to proceed.

Major products and systems include the following:

  1. Reuse existing architectural components (walls, raised access floor grid, and acoustical tile ceilings.)
  2. Reuse resisting “house” mechanical system (overhead air distribution.)
  3. Modify chilled water distribution.
  4. New chilled water computer room air conditioning (CRAC) units.
  5. Modify existing lighting system,
  6. New power distribution to server racks and cooling equipment.
  7. Modify existing fire suppression/alarm systems.

 

Short description: National Security Administration (NSA) Renovate Serverland Room 2 at Fort George G. Meade Meltech completed this important project for the National Security Administration for the renovation of the Serverland Room 2 at Fort George G. Meade in Fort Meade, Maryland. This project was for the National Security Administration Upgrade Infrastructure in Serverland Room 2. The […]

Short description: Smithsonian Institution Steven F. Udvar-Hazy National Air and Space Museum Design Build Construction Services for Improvements to the Parking Access and Revenue Control System (PARCS) Upgrades at the Parking Entrance in Chantilly, Virginia This project was for the design build construction services for improvements to the Parking Access and Revenue Control System (PARCS) upgrades at […]

Short description: Leidos Biomedical Research Facility (Leidos) Frederick National Laboratory for Cancer Research (FNLCR) Ft Detrick Building 362 Parking Lot Paving and Drainage Meltech completed this project for the paving and drainage for the Leidos Biomedical Research Facility Inc., in support of the Frederick National Laboratory for Cancer Research at Fort Detrick in Frederick, Maryland. The purpose […]

Short description: Department of Commerce (DOC) National Institution of Standards and Technology (NIST) Building 226 Design and Installation of the Intelligent Building Agents Research Laboratory This project was for the design and installation of the Intelligent Building Agents Research Laboratory for the Department of Commerce at the National Institution of Standards and Technology in Gaithersburg, Maryland. The […]

Short description: US Army Corps of Engineers Mechanical Upgrades and Roof Repairs to the Samuel S. Stratton Veteran Army Medical Center (VAMC) in Albany, New York Meltech completed this project for the US Army Corps of Engineers for Mechanical Upgrades and Roof Repairs to the Samuel S. Stratton Veteran Army Medical Center (VAMC) in Albany, New York.  […]

Short description: Department of the Army US Medical Research Acquisition Activity Installation of New Additional Emergency Power Services for NEC Data Center Building 1422 at Fort Detrick in Frederick, Maryland This project was for the Department of the Army US Medical Research Acquisition Activity at Fort Detrick for the Installation of New Additional Emergency Power Services for NEC […]

Short description: GSA PBS OOA Capital Construction Division, Center 2 United States Secret Service (USSS) 9th Floor PID RMB SCIF Renovation in Washington, DC Meltech completed this important project for the General Services Administration (GSA) Public Building Services (PBS) OOA Capital Construction Division for the United States Secret Services (USSS) Special Project with details limited. This project […]

Short description: Meltech completed this important project for the U.S. Coast Guard at the Douglas A. Munro Building 50 at the St. Elizabeth’s Hospital in Washington, DC. The Saint Elizabeth’s West Campus is the stewardship of the General Services Administration, Potomac Service Center.

Short description: Washington Suburban Sanitary Commission (WSSC) Construction Services at the Potomac Water Filtration Plant (WFP) Outdoor Substation 2 for existing 5kV Switchgear Meltech completed this project was for the Washington Suburban Sanitary Commission (WSSC) Construction Services at the Potomac Water Filtration Plant (WFP). This project was for construction services to the Outdoor Substation 2 for existing […]

Short description: Washington Suburban Sanitary Commission (WSSC) Richard G. Hocevar (RGH) Building Data Center Upgrades Meltech was awarded this task order under our WSSC RGH Data Center Upgrades SATOC. This project was for the Washington Suburban Sanitary Commission (WSSC) Richard G. Hocevar (RGH) Building Data Center Upgrades in Laurel, Maryland. The work for this data center renovation […]