NAVFAC Quantico Marine Corp Base Building 3228 in Quantico, Virginia
General Synopsis
Meltech completed this project for the Naval Facilities Engineering Command Washington for the replacement of the modular office and installation of a new mezzanine at Building 3228 at Quantico Marine Corps Base in Quantico, Virginia. The project was completed in 3 phases: Phase 1: Demolition and Removal; Phase II: Installation; and Phase III: Installation of Storage Racks.
Further Details
Phase I – Demolition and Removal
Demolition and removal of preexisting pre-fabricated office and security cage.
Phase II – Installation
Installation of a four wall single story, load bearing modular office with above Mezzanine in the Northeast comer of building 3228. The new modular office was installed at least 8″ above existing ground level to avoid possible flooding. The modular office required a 2 hour fire separation.
This modular office spanned from the Northeast side of building 3228 to the Westside. (Approximately 19’0″ x 10’0″ = 190 square feet). The expansion provided enough space to accommodate two (2) workstations at the north side wall and accommodate five (5) single workstations at the southeast corner wall of the office.
The office included (2) two office solid doors 90 min fire rated with all required hardware on south side wall of office along with the installation of a 15′ x 4′ window.
Three (3) outlets in the north side wall, five (5) outlets in the south wall. Two (2) outlets on the east side wall and two (2) outlets on the west wall.
Stairs with hand rails (outside) west side of the office for accessibility to the above office Mezzanine space. Mezzanine required a rail at least 42″‘ high, with a flip over gate at the south side of the mezzanine for loading.
HVAC unit with minimums of 12,000 (BTU) cooling and 10,500 BTU heating. (Note: HVAC was a component of the Modular Office which required the drain lines installed to provide proper drainage of condensation that may cause any damage to the new structure.
Connect all power requirements from the preexisting power box inside of building 3228 for the new pre-fabricated office.
PHASE Ill – Installation of Storage Racks
Installation of Republic Storage rack system type at the Southeast side of building 3228, at locations E I -E3 and F I – F3. Three (3) upright frame columns 10′ high, same gauge as the existing upright at building 3228, and eight (8) Beams 8′ long and eight (8) wiring mesh shelving similar to the one at the current shelving.
Short description: NAVFAC Quantico Marine Corp Base Building 3228 in Quantico, Virginia General Synopsis Meltech completed this project for the Naval Facilities Engineering Command Washington for the replacement of the modular office and installation of a new mezzanine at Building 3228 at Quantico Marine Corps Base in Quantico, Virginia. The project was completed in 3 phases: Phase […]
Short description: U.S. Army Corps of Engineers Baltimore District Frederick National Laboratory of Cancer Research (FNLCR) Occupancy Sensors, 200 kWPV, and Thermostats at Fort Detrick in Frederick, MD and Forest Glen Annex, Maryland This project was for the installation of occupancy sensors at the Fort Detrick and Forest Glen Annex for the reduction of energy usage garrison wide […]
Short description: US Army Corps of Engineers National Defense University Fort McNair Marshall Hall South Plaza in Washington, DC General Synopsis Meltech completed this important project for the US Army Corps of Engineers Baltimore District for the National Defense University George Marshall Hall at Fort Lesley J. McNair in Washington, DC. The project included the demolition, construction […]
Short description: Smithsonian Institution Renovate Education Offices at the Freer Gallery of Art and Arthur M. Sackler Gallery (Freer|Sackler) in Washington, DC General Synopsis This project was for the renovation of the Education Offices located at the Smithsonian’s Freer Gallery of Art (FGA) and Arthur M. Sackler Gallery (Freer|Sackler) in Washington, DC. The work included the demolition […]
Short description: Leidos Biomedical Research Facility (Leidos) Frederick National Laboratory for Cancer Research (FNLCR) Building 539, Create a New NOD scid gamma (NSG) Mice Suite at Fort Detrick Meltech completed this important project for the Leidos Biomedical Research Facility (Leidos) in support of the Frederick National Laboratory for Cancer Research (FNLCR) for the Building 539 renovations to […]
Short description: National Security Administration (NSA) Renovate Serverland Room 2 at Fort George G. Meade Meltech completed this important project for the National Security Administration for the renovation of the Serverland Room 2 at Fort George G. Meade in Fort Meade, Maryland. This project was for the National Security Administration Upgrade Infrastructure in Serverland Room 2. The […]
Short description: Leidos Biomedical Research Facility (Leidos) Frederick National Laboratory for Cancer Research (FNLCR) Ft Detrick Building 362 Parking Lot Paving and Drainage Meltech completed this project for the paving and drainage for the Leidos Biomedical Research Facility Inc., in support of the Frederick National Laboratory for Cancer Research at Fort Detrick in Frederick, Maryland. The purpose […]
Short description: GSA PBS OOA Capital Construction Division, Center 2 United States Secret Service (USSS) 9th Floor PID RMB SCIF Renovation in Washington, DC Meltech completed this important project for the General Services Administration (GSA) Public Building Services (PBS) OOA Capital Construction Division for the United States Secret Services (USSS) Special Project with details limited. This project […]
Short description: Washington Suburban Sanitary Commission (WSSC) Richard G. Hocevar (RGH) Building Data Center Upgrades Meltech was awarded this task order under our WSSC RGH Data Center Upgrades SATOC. This project was for the Washington Suburban Sanitary Commission (WSSC) Richard G. Hocevar (RGH) Building Data Center Upgrades in Laurel, Maryland. The work for this data center renovation […]
Short description: US Army Design Build Renovations at Fort Belvoir Community Care Unit Building 802 at Fort Belvoir, Virginia Meltech was awarded this project to provide all materials, labor, equipment, transportation, and services to complete the design and build and renovation of Building 802. Building 802 is a one plus-story brick facility built in 1977 with approximately […]